beautypg.com

Talkaphone WEBS-PM Pedestal Mount with WEBS User Manual

Installation instructions

background image

WEBS-PM

– Pedestal Mount

Emergency Phone Station with WEBS

®

Installation Instructions

Copyright 2014 Talk-A-Phone Co.

• 7530 North Natchez Avenue • Niles, Illinois 60714 • Phone 773.539.1100 • [email protected] • www.talkaphone.com.

All prices and specifications are subject to change without notice. Talk-A-Phone, Scream Alert, WEBS and WEBS Contact are registered trademarks of Talk-A-Phone Co. All rights reserved.

Rev. 4/7/2014

I. Introduction

WEBS-PM Pedestal Mount Emergency Phone Station with WEBS

®

is designed to mount to concrete

foundation using anchor bolts.

II. Contents

Before beginning installation, make sure you have all the included components. Each Pedestal consists
of three packages. Package #1 is the labeled WEBS-PM-KIT. Package #2 is labeled ETP-PM PARTS.
Package #3 contains the Pedestal itself.

WEBS-PM-KIT

Qty.

Part Number

Description

1

68642

2-Channel Amplifier

1

86396

Power Supply (12VDC, 5A)

2

83075

Loudspeaker

ETP-PM PARTS

Qty.

Part Number

Description

4

42838

J-Bolts

8

42839

3/4"-10 Hex Nut

8

42840

3/4" Washer

3

42867

10-24 x 1/2" Tamper Resistant Screws

2

42843

6-32 Hex Nut

1

68590

LED Panel Light (12-24VAC/DC, 120VAC)

1

67478

Polycarbonate Cover for LED Panel Light

1

24717

Pedestal Mount Aluminum Template

III. Installation

1. Electrical and telephone line conduits should be run through the foundation and into the center 4"

diameter hole of the Pedestal.

NOTE: To insure proper grounding of all electrical components, the tower mount should be effectively earth grounded
from the grounding stud (located across from the lower access panel) with 6 AWG or better insulated, stranded copper
wire to the metallic power service raceway (conduit) or an 8 foot or longer corrosion-resistant ground spike. It is the
installer's obligation to ensure compliance with all national, regional, and local regulations

.

2. Pour the foundation at least 2-feet in diameter and 3-feet deep according to your local code and frost

line.

3.

Install the four (4) 3/4” - 10 x 24” long anchor bolts below grade with five inches (5”) projecting
above grade
. Use the template provided to properly position the bolts within the concrete
foundation.