beautypg.com

Talkaphone ETP-PMD-SS Dual Faceplate Stainless Pedestal Mount User Manual

Pedestal mount installation instructions

background image



Pedestal Mount Installation Instructions

Copyright 2014 Talk-A-Phone Co. All rights reserved.


Talk-A-Phone Co.

• 7530 North Natchez Avenue • Niles, Illinois 60714-3804

Rev. 4/7/2014

Phone 773.539.1100 • Fax 773.539.1241 • [email protected] • www.talkaphone.com

All prices and specifications are subject to change without notice.

Talk-A-Phone, Talk-A-Lert, Scream Alert and WEBS are registered trademarks of Talk-A-Phone Co.


I.

Introduction


NOTE:
This manual is for anchor bolts installation into the foundation and the pedestal installation for models
ETP-PM, ETP-PM-SS, ETP-PMD, and ETP-PMD-SS.

II.

Contents


Before beginning installation, make sure you have all the included components. Each Pedestal consists of two
packages. Package #1 contains the pedestal itself. Package #2, labeled PARTS contains the following:

Anchor Bolt Install Kit
QTY

Part Number

Description

4

42838

J-Bolts

1

24717

Aluminum Template

Pedestal Install Kit (keep for use when installing the pedestal)
QTY

Part Number

Description

6

42867

10-24 x3/4" oval head tamperproof screw

8

42839

3/4"-10 Hex Nut

8

42840

3/4" Washer

2

42843

6-32 hex nut

1

67478

Polycarbonate light cover

1

68590

LED light board (12-24V AC/DC - 120VAC)


III.

Foundation Preparation
1. Electrical and telephone line conduits should be run through the foundation and into the center 4"

diameter hole of the pedestal.

NOTE: To insure proper grounding of all electrical components, the pedestal mount should be
effectively earth grounded from the grounding stud (located across from the lower access panel) with
6 AWG or better insulated, stranded copper wire to the metallic power service raceway (conduit) or an
8 foot or longer corrosion-resistant ground spike. It is the installer's obligation to ensure compliance
with all national, regional, and local regulations.

2. Pour the foundation at least 2 feet in diameter and 3 feet deep according to your local code and frost

line (see foundation drawing on following page).

3.

Install the four (4) 3/4” - 10 x 24 long anchor bolts below grade with five inches (5”) projecting
above grade
(see foundation drawing on following page). Use the template provided to properly
position the bolts within the concrete foundation.

NOTE: Make sure all connections meet National, Regional, and Local Electric Codes.