Prepare to assemble the fill/pump-out port – Satellite MX3 Turbo Foot Flush User Manual
Page 3

17823 REV J
3
Step#12
step#13
step#14
Place bowl in tank and mark a center line
on the tank rim using the center of the
nozzle in the bowl.
Cut out the pattern and place the instruction
template over rim and align with center line
and mark cut out.
Using a jigsaw, cut out marked out
clearance notch
Or with 2" hole saw
Prepare
tank
and
bowl
assembly
Step#15
step#16
step#17
Drill dimple on inside of tank rim with a
2" hole saw. Start drill straight into dimple,
until pilot bit goes through inside surface.
Tilt hole saw at 90 degrees of toilet rim. Drill
through surface. Clean and deburr hole.
Attach the hose to the bowl. Use teflon
tape on nozzle. Thread bowl with nozzle
into 90-degree elbow.
Step#18
step#19
Remove plastic screws. Insert (2) tee nuts
and close hinge.
Position the Bowl and Toilet Seat over the T-
Nuts as shown. Hand thread (2) ¼-20 screws
and washers into the T-Nut. Tighten the
screws. Snap the screw covers into place
Prepare to assemble the Fill/Pump-out Port.