beautypg.com

Torbal ATS120 User Manual

Page 32

background image

- 31 -

Instruction Manual – ATS / BTS Moisture Analyzers


7.

After the tare is complete, the screen requests that the External Load, to be placed on the pan.


8.

Place the External Load on the pan.


9.

When the calibration weight is placed on the

pan, the scale will automatically begin the
calibration process.


10.

When calibration is complete, the calibration

mass value will be displayed.









































This manual is related to the following products: