Anchor-jamb-head, Frame installation – Oldcastle BuildingEnvelope 3000 Series Thermal MultiPlane User Manual
Page 42

42
S E R I E S 3 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L
FG-2122 FILLER
CUT 4" LONG
(SOLD IN STOCK LENGTHS)
FRAME INSTALLATION
FG-2188 PVC FILLER
MAY BE USED TO IMPROVE
INSTALLATION OF
PERIMETER SEALS.
(OPTIONAL)
SILL ANCHORS, LOCATE NO MORE
THAN 4" AWAY FROM EACH SIDE
OF MULLION. ADDITIONAL ANCHORS
MAY BE REQUIRED BASED ON PROJECT
STRUCTURAL REQUIREMENTS.
SEE PAGES 44 & 45 FOR PERIMETER
ANCHOR CONDITIONS.
NOTES:
1) WHEN USING OPTIONAL FG-3413 SILL RECEPTOR, SILL ANCHORS ARE NOT REQUIRED.
2) ANCHOR SIZE AND FREQUENCY SHOULD BE DETERMINED BY STRUCTURAL REQUIREMENTS.
3) SILL AND HEAD ANCHORS SHOULD BE LOCATED SO THAT THE ANCHOR IS NOT MORE THAN
4" AWAY FROM EACH SIDE OF MULLION.
4) ASSEMBLY WITHOUT FLASHING IS NOT RECOMMENED.
5) ASSEMBLY USING A NON-THERMAL OR SHEET METAL FLASHING WILL RESULT IN LOSS OF
THERMAL CONTINUITY AND IS NOT RECOMMENDED.
6) DO NOT ANCHOR WALL THROUGH VERTICAL LEG OF SUB-SILL.
SEE PAGE 44 & 45 FOR OPTIONAL HEAD
ANCHORAGE.