Frontset-isg-jamb-assy-ssg – Oldcastle BuildingEnvelope 3000 Series Thermal MultiPlane User Manual
Page 25

DRILL 5/16" WEEP HOLES LOCATE
AT 1/4 POINTS
(DO NOT COVER WITH SETTING BLOCK)
FG-3280
FG-3280
FG3000-FP-4
BED IN SEALANT
9/16"
1-1/4"
5/8"
*FG3000-FP-30
PART# 876
FS-9 (TYP.)
TOP OF
HORIZONTAL
FG-3334
USE WITH
SSG MULLION
FG-3293
USE WITH
CAPTURED
MULLION
9/16"
1-1/4"
1-3/4"
APPLY SILICONE
SEALANT TO END
OF HORIZONTALS
AND VERTICALS
AS SHOWN
APPLY SILICONE SEALANT
IN GLAZING REGLET OF
VERTICAL WHERE IT MARRIES
WITH SEALANT APPLIED TO
THE HORIZONTAL
1-3/4"
1-1/4"
FG-3436
FS-8
PART #: 10223
FS-8
PART #: 10223
5/8"
1-1/16"
NOTCH AT
HEAD
FS-55
FS-55
NOTE:
*SHEAR BLOCK PACKAGES
INCLUDE FASTENERS
REFERENCE PAGE 40 FOR USE OF DJ-7 DRILL FIXTURE.
#11 (0.191 DIA)
TAP HOLE
"F" (0.257 DIA) DRILL
HEAD & SILL
FG3000-PP-56
END DAM. ALIGN WITH
GLAZING POCKET OF
JAMB AND SEAL TO
TO JAMB AND SILL
FG-3278
INSIDE GLAZED, FRONT SET
JAMB ASSEMBLY FOR SSG SYSTEM
25
S E R I E S 3 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L