Frontset-drill-jig-ssg, Series 3000 thermal multiplane installation manual, Ssg fabrication using drill fixture – Oldcastle BuildingEnvelope 3000 Series Thermal MultiPlane User Manual
Page 40

SERIES 3000 THERMAL MULTIPLANE INSTALLATION MANUAL
NOTES:
1) DRILL MULLION AND SILL USING DJ-7 DRILL
FIXTURE, HEAD EXTRUSION MUST BE HAND LAID OUT
AND DRILLED ON ID LINES (SEE PAGE 23 thru 25).
1) DRILL ALL HOLES IN MULLION USING A #11 (.191Ø) DRILL
2) DRILL OUT HOLES IN SILL FOR SCREWSPLINE ASSEMBLY
USING "F" (.257Ø) DRILL
REFERENCE FRONT SET ASSEMBLY
DRAWINGS FOR ADDITIONAL
INFORMATION, SEALANT APPLICATION
AND EXTRUSIONS.
REFERENCE PAGE 39 FOR DRILL FIXTURE
FOR FG-3437 CAPTURED MULLION.
THIS SIDE OU
T FOR
SSG VE
R
TICALS
ALIGN WITH TOP
OF HORIZONTAL
DJ-7 DRILL FIXTURE
SSG FABRICATION
USING DRILL FIXTURE
FG3000-FP-30
NOTE: THIS SIDE
OUT FOR SSG
VERTICALS
FG-3280
(G-H Left End,
A-B Right End)
FG-3437 / FG-3333
(A-G)
NOTE: THIS SIDE
OUT FOR RW SILL
THIS SID
E OU
T FOR
CAP
TURED
VER
TIC
ALS
& R
W SILL
THI
S SID
E O
UT
FOR
CAP
TURED
VER
TIC
ALS
& R
W S
ILL
A
B
C
D
E
F
G
H
A
B
C
D
E
F
H
G
G
H
E
F
C
D
A
B
(E-F, C-D Opp.)
40
S E R I E S 3 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L