Frontset-drill-jig, Front set mullion fabrication using drill fixture – Oldcastle BuildingEnvelope 3000 Series Thermal MultiPlane User Manual
Page 39

FRONT SET MULLION
FABRICATION USING DRILL FIXTURE
ALIGN WITH TOP
OF HORIZONTAL
ALIGN WITH TOP
OF MULLION
DJ-7 DRILL
FIXTURE
ALIGN WITH
BOTTOM OF MULLION
NOTES:
1) DRILL ALL HOLES USING #11 (.191Ø) DRILL
2) SHEAR BLOCK CONNECTIONS DRILL WITH
#11 (.191Ø) DRILL
3) SCREWSPLINE CONNECTIONS DRILL OUT
HOLES USING "F" (.257Ø) DRILL
REFERENCE FRONT SET ASSEMBLY
DRAWINGS FOR ADDITIONAL
INFORMATION, SEALANT APPLICATION
AND EXTRUSIONS.
FG3000 -FP-31 (E-F, C-D Opp.)
FG-3296 (G-H, A-B Opp.)
FG-3291 (C-D, E-F Opp.)
FG-3293 / FG-3294 (A-B, G-H Opp.)
THIS SIDE OUT FOR
CAPTURED VE
R
TICALS
& RW SILL
THIS SIDE OUT FOR
CAPTURED VE
R
TICALS
& RW SILL
THIS SIDE OUT FOR
CAPTURED VE
R
TICALS
& RW SILL
FG3000-FP-29 (C-D, E-F Opp.)
FG-3280 (A-B, G-H Opp.)
FG3000-FP-30
FG3000-FP-30 (C-D, E-F Opp.)
NOTE: THIS SIDE
OUT FOR CAPTURED
VERTICALS
A
B
C
D
F
E
G
H
A
C
D
B
F
E
H
G
A
C
D
B
F
E
H
G
(A-B, G-H Opp.)
39
S E R I E S 3 0 0 0 T H E R M A L M U L T I P L A N E I N S T A L L A T I O N M A N U A L