Template for o.g. shear blocks, Dj18 drill guide at transom head, B - shear blocks at screw – EFCO 406 (T) Series User Manual
Page 9: Step 5), Step 4), Step 1) step 2) step 3)
![background image](/manuals/636022/9/background.png)
AT THIS TIME FOR EASE OF ASSEMBLY.
BLOCK PREPS, AS SHOWN ON PAGES 14 AND 15.
PROCEED TO SECTION III C FOR HORIZONTAL TO SHEAR
THESE PREPS SHOULD BE DONE TO THE DOOR JAMBS
HINGING PREPS, STRIKE PREPS, AND THRESHOLD PREPS.
HARDWARE MANUAL (PART #Y015), FOR THE DOOR
PLEASE REFER TO DOOR, DOOR GLASS, AND
(See page 3 of the parts identification section.
STEP 5)
NOTE: Drill jigs are available.
STEP 4)
B - SHEAR BLOCKS AT SCREW
head, and any intermediate horizontal that is being incorporated in
it will be necessary to shear block the transom bar, the transom
Because the screw spline door jamb is actually a tubular member,
Transom bar glass stop cut length = D.L.O. - 25/32"
Horizontal glass stop cut length = D.L.O. - 1/32".
Horizontals and transom bar cut length = D.L.O.
SECTION III FABRICATION
SPLINE DOOR JAMB
MEMBER'S SIGHT LINES TO DETERMINE THE HORIZONTAL
CUT THE DOOR JAMBS TO ROUGH OPENING MINUS 1/4".
DRILL THE HOLES FOR THE SHEAR BLOCK SCREWS ON
NOTE: Door jambs run to the floor and are cut longer than other
NOTE: Consult A.D.A. requirements to verify door opening
MEASURE THE OPENINGS AND SUBTRACT THE VERTICAL
THE DOOR JAMBS AS SHOWN ON PAGES 8 THROUGH 13.
FRAME CUT LENGTHS.
width compliance.
STEP 1)
STEP 2)
STEP 3)
verticals.
the transom area.
PAGE 7
CSJ 12/2006
406 STOREFRONT