General notes, Iii fabrication, A) screw spline fabrication – EFCO 406 (T) Series User Manual
Page 3
![background image](/manuals/636022/3/background.png)
REFERENCE THESE OTHER MANUALS:
INTERNATIONAL 200 CONCEALED OVERHEAD CLOSERS
STOREFRONT INSTALLATION INSTRUCTIONS
DORMA RTS 88 CONCEALED OVERHEAD CLOSERS
SECTION I - GENERAL NOTES
2" x 6 1/2" - 1" GLAZING (THERMAL)
SERIES 406
to become thoroughly familiar with the project. The shop drawings
Check shop drawings, installation instructions, and glazing instructions
the standard 403 - 2" x 4 1/2" can be used with this deep system.
Clean aluminum surfaces with a mild detergent and water. No
and acid based materials can be harmful to the finish.
Protect materials after erection. Cement, plaster, alkaline solutions,
All materials are to be installed plumb, level, and true.
manufacturer for recommendations regarding compatibility and adhesion.
Sealants must be compatible with all surfaces. Consult with the sealant
Check construction for compliance with the contract documents.
as established by the architectural drawings and the general contractor.
All work should start from bench marks and/or column center lines
See Section II "PARTS IDENTIFICATION", also particular parts from
everything required to begin installation.
Check all of the materials upon arrival and be sure you have
AND COVER THE MOST COMMON CONDITIONS AND SITUATIONS.
THESE INSTALLATION INSTRUCTIONS ARE OF A GENERAL NATURE
take precedence for extrusions and details on the project.
Masonry runoff may leach harmful acids onto the storefront.
This situation must also be taken into consideration at installation.
REFERENCE THE STANDARD STOREFRONT INSTALLATION INSTRUCTIONS
FOR COVERAGE OF ITEMS COMMON TO STOREFRONT SYSTEMS.
DOOR, DOOR GLASS, and HARDWARE
SYSTEMS 401, 402, and 403
abrasive agent shall be used.
5)
6)
7)
3)
4)
2)
NOTE:
1)
Y014
Y015
Y001
Y013
PAGE 1
DPS 12/2002
406 STOREFRONT