Glazing preparation – EFCO S5600 Structural Glazed User Manual

Page 13

background image

EFCO CORPORATION 7/2012 PART NO. Y306

Page 13 of 28

Series 5600 Silicone Structural Glazed Installation Instructions

JAMB

Section VI: Glazing Preparation

Glazing Preparation

A.)

Install PVC thermal isolator
(90 Durometer) in horizontal

and vertical, run continuously,
and butt joint as required.

Note: All PVC thermal isolators

should be removed from the
reels and allowed to shrink
prior to installation.

Seal all connecting surfaces of

horizontal and vertical with sealant

for installation of mullion plugs.

Just prior to installation of mullion

plugs, seal gasket raceway and

tongue with sealant to close void at

joint plug locations. Sealant height

should be a minimum of 1”.

Seal around joint plug

before installation.

Mullion joint plug