beautypg.com

EFCO S5600 Structural Glazed User Manual

Page 10

background image

EFCO CORPORATION 7/2012 PART NO. Y306

Page 10 of 28

Series 5600 Silicone Structural Glazed Installation Instructions

Section IV: Frame Assembly

Frame Assembly

C.)

Refer to “APPROVED” shop drawings for job conditions. Install assembled frames
according to “APPROVED” shop drawings. “APPROVED” shop drawings will also

indicate location of horizontal slip-on rails.

MI

N.

1/2

"

D.)

Properly support horizontal until securely fastened.

E.)

Space vertical mullion expansion joints per “APPROVED” shop drawings.

Keeping in mind that spacing is theoretical and will vary with job site temperature,
on multiple stacked applications, key horizontals must be installed to establish

grades regardless of expansion joint dimension.

Shear Block

#14 X 1/2” HWHSMS 

#8 X ¾” FH SMS

When applying horizontal mullion with
front notch, fill notched completely

with sealant, after horizontal is in

position.

Slip-on Horizontal

Note: When using slip-on horizontal, 2
screws are required on top and bottom
of horizontal into the shear block.

Sealant