Series 5500 Advanced & Alternate Installation Instructions

Section V: Vertical Splice Joints

STEP #5 ALIGN AND STACK ASSEMBLED FRAMES

A. Align the pre-assembled frames and stack together at the splice joints.

B. Ensure the 1/4” x 1” x 5” long foam caulk joint backer is inserted into the gap

between the thermal struts in the upper mullion as noted below.

C. Position the mullions to the appropriate elevation with regard to established

benchmarks, and shim or fix the mullions at their respective dead load anchor

points.

D. Snap-in both of the adjacent frames before sealing the mullion splice joints.

E. Clean the splice sealant-contact areas per sealant manufacturer’s

recommendations.

F. Apply backer rod between the mullions, adapters, and splice to back-up the joint,

seal the joint and tool as shown on page 30.

UPPER FRAME

ASSEMBLY

LOWER FRAME

ASSEMBLY

MULLION

SPLICE SLEEVES

ADJACENT FRAME

ASSEMBLIES

Insert foam caulk

joint backer between

thermal struts.