beautypg.com

Pre-assembly preparation, Tools required, Prepare drill – Great Plains VARIABLE RATE KIT Operator Manual User Manual

Page 3: Work location

background image

Great Plains Mfg., Inc.

Front

Parts

Installation Instructions

3

6/23/2010

Front

Parts

166-263M

Pre-Assembly Preparation

Tools Required

• suitable tractor for positioning and operating the air

drill or cart

• the seed monitor console to be used with this imple-

ment (or a 2008 or later DICKEY-john

®

IntelliAG

®

10in LCD console)

• basic hand tools, including (for older ADC2350/B

only), a drill with bit size:

1

4

in (0.250in), letter size E, or 6.3mm

Prepare Drill

The mechanical installation may be performed on a dis-
connected air cart, but software update (if required), and
testing/configuration of the system require the complete
air drill, and an IntelliAG

®

virtual terminal.

Work Location

5.

Move the air cart or air drill to a location with:

6.

NTA607/2007HD and NTA907/3007HD only:
Fold drill. Lower openers. This eases access to the
meters.

7.

Shut off tractor or hydraulic source.

• room to fold it (NTA607/2007HD and NTA907/

3007HD only);

• access to tractor or hydraulic power;

• access to DICKEY-john

®

IntelliAG

®

console and

12Vdc power;

• adequate illumination; and,

• clear surface beneath for recovery of any falling

or dropped parts - if the surface is not clear, have
a tarp or drop cloth available.