beautypg.com

Install master switch – Great Plains VARIABLE RATE KIT Operator Manual User Manual

Page 14

background image

14

Air Drill Variable Rate Kit

Front

Parts

Great Plains Mfg., Inc.

166-263M

Front

Parts

6/23/2010

Install Master Switch

Refer to Figure 21 and Figure 22
69. In the tractor cab, locate the master switch connec-

tion lead

. On newer air carts and all air drills, this

is an un-terminated 2-pin weatherpak connector.

On older air carts, this lead may already have a
master switch connected to it. If so, continue at
ACC Re-Configuration” on page 15.

Refer to Figure 21 and Figure 22
70. Select one new:

467980124 ISO MASTER SWITCH

Set the switch to OFF.

71. Mount the switch near the monitor virtual terminal,

allowing enough cable length to reach the harness
connection located at step 69. Mount the switch
where it will be convenient for operations, but not
obstruct your view of the road.

72. Connect the 2-pin lead

of the switch to harness

lead

.

Figure 21

Cab Harness Connection

29514

6

19

6

Figure 22

Master Switch

29505

7

19

19

7

6