Pre-delivery planning, Tools required, Work space requirements – Great Plains NP3000A Predelivery Manual User Manual
Page 9: Delivery cycle, Pre-delivery planning tools required, Work space requirements delivery cycle

03/31/2011
407-613Q
Great Plains Manufacturing, Inc.
5
Pre-Delivery Planning
To meet highway clearance requirements, Nutri-Pro
®
implements are shipped with a few components and/or
sub-assemblies uninstalled.
The exact list and status of uninstalled components var-
ies with implement model, implement width, hitch type
and options ordered. Shipping configuration may change
over time.
This manual assumes a hypothetical extreme case of
disassembly. Inspect the delivered implement, and skip
steps that are already completed.
Tools Required
• One or more lifters with a combined capacity of
12,000 to 15,000 pounds (5450-6800 kg)
• Adjustable stands or supports.
• Hydraulic oil (3 to 5 gallons, 11 to 19 liters)
• Pipe sealant
• Basic hand tools
Work Space Requirements
Final assembly of the applicator requires a well-lit, flat
surface space large enough to accommodate the fully
unfolded implement, any wing extensions, any pull-type
tongue, any rear casters, and lifter access from all sides.
Delivery Cycle
Standard Great Plains deliveries do not include time for
implement assembly while still on the trailer bed. If you
are reviewing this manual prior to delivery, and you antic-
ipate that you might have a problem implementing the
unload instructions, notify Great Plains prior to shipment.