Great Plains 3N4010HDA Predelivery Manual User Manual
Pre-delivery manual, Manufacturing, inc
Table of contents
Document Outline
- Pre-Delivery Manual
- Important Safety Information
- Introduction
- Air Cart Pre-Delivery
- Air Drill Pre-Delivery
- Drill Preparation
- Tools Required
- Drill Pre-Assembly Checklist
- Unload Truck
- Remove Shipping Wheels
- Spot Implements
- Check Drill Level
- Locate Parts
- Drill Assembly
- Install Markers (Option)
- Install Weight Brackets
- Attach Rear Hitch
- Install Towers
- Lateral Tower Location (Figure 17)
- Tower Inlet Angle (Figure 17)
- Tower Height (Figure 18)
- Install Primary Hoses
- Install Secondary Hoses
- Install Lift Switch
- Route Lighting Cable
- Route Monitor Harness
- Install Blockage Detectors (Option)
- Install WSMBs
- Prepare Hoses for Sensors
- Install Blockage Sensors
- Mount Row Harnesses
- Connect Sensors to Row Harnesses
- Install WSMB Harnesses
- Interconnect WSMB Section Harnesses
- Blockage Harness Routing
- Install Hitch Harness
- Install Left-Center Extension
- Install Center-Right Extension
- Install Right-Rear Extension
- Install Rear Hitch Extension
- Install Press Wheels
- Install Options
- Hitch Air Cart to Drill
- Appendix