Route monitor harness, Monitor harness without blockage – Great Plains 3N4010HDA Predelivery Manual User Manual
Page 32

30
3N-4010HDA and ADC2350B
Great Plains Manufacturing, Inc.
196-444Q
10/10/2008
Route Monitor Harness
If the drill was ordered with blockage detection, skip to
“Install Blockage Detectors (Option)” on page 31. Step
92 through step 96 are for a drill without detection.
Monitor Harness without Blockage
92. Select one:
467980130 40’ HITCH HARNESS
If
is not quickly located in a crate, check to see if
it is already installed on the drill. In either case, iden-
tify the plug (tractor) end of this cable, which has a
single connector (the rear end has two connectors).
93. Start plug end at the front drill hitch, leaving slack for
tractor hitching. Route it along the left tongue.
94. Select one:
467980141 10’ EXT HARNESS
If
is not quickly located in a crate, check to see if
it is already installed on the drill.
Mate this extension
to the 40ft harness
just
installed. Route it through the hoop at the wing pivot
to main frame center.
95. Select one:
467980360 3’ REAR HITCH HARNESS
Connect one end of rear harness
to the extension
. Route this harness to the rear hitch bulkhead
secure it to the last available large mounting hole in
the hose bracket installed at step 57.
96. Select all remaining ties. Secure all hoses and
cables with ties, including the lift switch cable
at
the rear hitch. Leave enough slack for it to connect to
the small bulkhead on the cart tongue.
Figure 32
Hitch Harness
27080
68
Figure 33
Implement Harness Routing (without Blockage Detection)
28188
28189
68
69
69
73
68
68
Figure 34
Harness Route (w/o Blockage)
27031
68
69
70
69
69
69
68
70
70
69
73
76