Spot implements, Check drill level, Locate parts – Great Plains 3N4010HDA Predelivery Manual User Manual
Page 15: Spot implements check drill level locate parts, Caution, Bf l r

Great Plains Manufacturing, Inc.
Air Drill Pre-Delivery
13
10/10/2008
196-444Q
Spot Implements
Choose an assembly location with ample room. Allowing
room for turns, the complete assembly of tractor, drill and
air cart may require a space with a:
length over 100 feet (30m) and
width of 50 feet (15m) without markers, or
width of 83 feet (25m) with markers.
!
CAUTION
Check for overhead lines, particularly if the drill will have
markers. The air cart requires at least 12ft (7.6m) vertically,
and more if auger deployment is contemplated.
30. Move the air cart
to the final assembly area.
Block the wheels.
31. Fold the drill.
32. Move the drill
to the final assembly area, about 9 ft
(1m) in front of the pintle ring of the air cart.
33. Raise the drill off the lock channels.
Unfold the drill.
34. Remove the lock channels (six).
Lower the drill.
Check Drill Level
35. Refer to the drill Operator manual and check topics:
“Opener Frame Height”,
“Side-to-Side Level”,
“Front-to-Back Level” and
“Section Alignment”
Locate Parts
36. Review the Parts Lists beginning on page 39. Deter-
mine which crates or cartons contain the items.
37. Locate all cable ties, and gather them at one spot.
Set this size apart from the others:
800-082C CABLE TIE .31X21.5 6DIA 120LB
Use these only when specifically called by part num-
ber.
Figure 9
Assembly Clearances
(without markers)
40 ft
10.2m
70 ft
21.3m
2
1
B
F
L
R
83