Job specification sheet – Watts Fleck 7000 Plastic Valve User Manual
Page 3
Job Number:
.
Model/Serial Number:
Water Test:
Capacity Of Unit:
Max:
Per Regeneration:
Brine Tank Size:
Salt Setting per Regeneration:
Treated Water Capacity (Gallons/Liters)
Regeneration Day Override (Max Days Between Regen)
Regeneration Time (AM/PM)
Type of Timer (with Meter/without Meter)
Notes
Page 3
Job Specification Sheet