3 installation diagram, Installation diagram – Metrohm 850 Professional IC Anion MSM-HC User Manual
Page 25

■■■■■■■■■■■■■■■■■■■■■■
3 Installation
850 Professional IC Anion – MSM-HC
■■■■■■■■
15
■
Connect guard column (optional) (see Chapter 3.20, page 62)
– Fasten the guard column to the end of the column inlet
capillary according to the specifications contained in the
leaflet accompanying the guard column.
– Rinse guard column.
■
Connecting the separation column (see Chapter 3.21, page 64)
– Fasten the inlet of the separation column either to the end
of the column inlet capillary or to the guard column (if
used) according to the specifications contained in the leaf-
let accompanying the column.
– Fasten the MSM-HC capillary labeled with Eluent with a
6.2744.070 PEEK pressure screw at the output of the sepa-
ration column.
■
Hang separation column with chip in the column holder of the
instrument.
10 Conditioning the instrument
(see "Conditioning the system", page 67)
3.3
Installation diagram
The following installation diagram shows the schematics of the front of
the instrument after installation is complete. Many capillaries are already
installed at the time the instrument is delivered; these capillaries are not
numbered in the diagram. Numbered capillaries must be connected at the
time of installation.