beautypg.com

Chapter 3 installation, Unpacking and inspection, Site and shelter requirements – Bird Technologies 8630B Series User Manual

Page 23: Mounting, Coolant, D chapter 3 - installation, Installation

background image

7

Chapter 3

Installation

This chapter provides information for on-site requirements,
unpacking, inspection, and preparing the load for use.

The 8630 and 8630B series load is to be installed, and operated, in a
horizontal position. The unit is shipped horizontal, and normally
stands on its attached base brackets.

Unpacking and

Inspection

1. Carefully inspect the shipping container for signs of damage. If

damage is noticed, do not unpack the unit. Immediately notify the

shipping carrier and Bird Electronic Corporation.

2. If the container is not damaged, unpack the unit. Save the packing

materials in case the unit should need to be shipped again.

3. Inspect all of the components for visible signs of damage.

Immediately notify the shipping carrier and Bird Electronic

Corporation of equipment damage or missing parts.

Site and Shelter

Requirements

The load may be operated anywhere that adequate ac line power and
ventilation are available, and ambient temperatures do not exceed
those given in the specifications.

Note: 10 kW being equivalent to 34,000 Btu/h (8568 kilogram- calories/
hr), a sufficient quantity of air must be provided. Allow room for
unobstructed air intake on the side facing the fan grille, and a clearance
of two or three feet beyond the grille outlet opposite.

Mounting

For installation of the equipment, mounting angle brackets are
attached to the front, and back edges of the enclosure. They may be
removed by unscrewing the four 8-32 Phillip Truss head screws
holding each bracket. These brackets have two slots each on the 14" x
21-15/16" (356 x 557 mm) centers to accommodate four 1/4" screws
that may be used for mounting the unit.

Coolant

Before shipment, the Moduload is drained of coolant to avoid possible
damage in transit from freezing. The system must be refilled with
coolant before it can be put into operation. The unit operates with 10

CAUTION

This equipment is designed for operation in a horizontal position only,

with mounting brackets down. Do not operate in any other manner.