beautypg.com

Rockwell Automation 1786-series ControlNet Coax Media Planning and Installation Guide User Manual

Page 58

background image

58

Publication CNET-IN002B-EN-P - June 2010

Chapter 3 Install a ControlNet Coax Media System

10.

Follow these guidelines when heating the tubing.

a. Place the tubing against the shoulder of the TNC connector.

b. Allow the heat gun to come to a temperature between

10…160

o

C (230…320

o

F).

c. Hold the cable assembly approximately 50 mm (2 in.) away from the

heat exhaust area of the heat gun while shrinking the tubing.

d. Continuously rotate the cable assembly around the heat exhaust area

of the heat gun. The entire process should take about four minutes.

e. Inspect the heat-shrink tubing to ensure that there are no voids

where the glue has incompletely melted, noting that voids could
cause a loss of the IP67 rating.

The tubing uses a heat-activated glue to help seal around the cable
and connector body. Some glue may be visible after the heating
process. Caution as this glue is hot.

Place the tubing against
the shoulder of the TNC
connector

Ensure that there are no
voids where glue has
incompletely melted

Shoulder of
TNC Connector

Total Length of Heat Shrink Tubing

31297-M