beautypg.com

Determine mounting order – Rockwell Automation 2093-AMxx Kinetix 2000 Integrated Axis Module and Axis Module Installation Instructions User Manual

Page 5

background image

Kinetix 2000 Multi-axis Servo Drives 5

Rockwell Automation Publication 2093-IN001B-EN-P - July 2013

Determine Mounting Order

Mount axis modules in the order (left to right) shown in the figure.

Module Mounting Order

IMPORTANT

The integrated axis module (IAM) must be positioned in the leftmost slot on the power rail,
followed by axis modules (AM).

Mount axis modules from left to right starting with the highest power utilization.

The shunt module is mounted to the right of the last AM module. The only exception is the
eight-axis power rail (catalog number 2093-PRS8S) that requires the shunt module mounted
in the rightmost slot.

ATTENTION: To avoid personal injury due to electrical shock, place a 2093-PRF slot filler module in
all empty slots on the power rail. Any power rail connector without a module disables the
Kinetix 2000 drive system; however, control power is still present.

Power Utilization or Amp Rating

Lowest

Integrated Axis Module

2093-AC05-MP5

Axis Module

2093-AM01

Axis Modules

2093-AMP2

2093-PRS7 Seven-axis Power Rail

Highest

Shunt Module

2093-ASP06

Slot Filler
2093-PRF