beautypg.com

Application guide – USG Ceiling True Wood User Manual

Page 30

background image

29

Specifications

aPPliCaTion

GUide

2.01

Products and Manufacturers

cont.

B. Accessories:
a. Wall molding: [M9:15/16"x9/16"x12', M7:7/8"x7/8"x12']—long angle shape of

prepainted steel.

b. Wood panel retention clip :WDRC
c. Wood panel perimeter clip:WDPC1
d. Edge trim: Optional; Compässo [selected size]

2.03

Metal Suspension Systems

C. Donn Brand Suspension Systems—Commercial quality, cold-rolled steel, hot-dipped

galvanized steel body. Materials Exposed surfaces color: coordinate with color of

selected ceiling panels.

a. [ Donn Brand DX 15/16" suspension System]
i. Main Tee : DX/DXL26, 12 ft x 1.64 in Heavy Duty Fire-Rated
ii. Cross Tee: DX/DXL424, 4 ft x 1-1/2 in
iii. Cross Tee: DX/DXL216, 2 ft x 1 in (for 2' x 2' only)
b. [ Donn Brand Fineline DXF/DXLF Ceiling Suspension System]
i. Main Tee: DXFH2924, 12 ft Main Tee Notch 24 in on center
ii. Cross Tee: DXF429, 4 ft Cross Tee ( 2' x 4' only)
iii. Cross Tee: DXF429N, 4 ft Cross Tee Notched mid-point (2' x 2' only)
iv. Cross Tee: DXF229, 2 ft Cross Tee (2' x 2' only)
c. [Donn Brand Centricitee DXT/DXLT Ceiling Suspension System]
i. Main Tee: DXT26, 12 ft x 1.64 in Heavy Duty
ii. Cross Tee: DXT424, 4 ft x 1-1/2
iii. Cross Tee: DXT222, 2 ft x 1-1/2 (2' x 2' only)
D. Suspension system: designed to support ceiling assembly as indicated on project

drawing with maximum deflection of 1/360.

3.01

examination

A. Examine substrates and structural framing to which ceiling systems attach or abut,

with Installer present, for compliance with requirements specified in this and other

Sections that affect ceiling installation and anchorage, and other conditions affecting

performance of ceiling systems.

B. Proceed with installation only after unsatisfactory conditions have been corrected.
C. Work to be concealed: Verify work above ceiling system is complete and installed in

manner that will not affect layout and installation of system components.

3.02

Preparation

A. Coordination: Furnish layouts for cast-in-place anchors, clips, and other ceiling anchors

whose installation is specified in other Sections.

B. Measure each ceiling area and establish layout of 3-dimensional ceiling systems.

Comply with layout shown on reflected ceiling plans.

C. Field dimensions: Installer must verify actual field dimensions prior to installation.