Step 1: preparation – USG Topo Ceiling System User Manual

Page 2

background image

Page 2 of 12

A.

The 2-D plan view lists all components
and shows where each part will be
installed in the assembly.

T

OPO

Ceiling

System
Installation
Instructions

Step 1: Preparation

Begin the installation process by
cleaning an area large enough to lay
out all components of the T

OPO

3-Dimensional System.

Review the parts list and 3-D and
2-D drawings. Take inventory of all
components, using the parts list as
your master reference.

The 3-D isometric drawing shows
locations and elevations for the Main
Tees and hanger wires.