Step 6: Panel Installation

T

OPO

Ceiling System
Installation
Instructions

A.

B.

C.

D.

E.

F.

G.

H.

To prevent dust from accumulating, be
sure to install the T

OPO

panels only after

all other construction activity has been
completed.

After unpacking the T

OPO

Panels and

prior to installation, spray and wipe each
panel with the provided anti-static spray
and lint-free towel.

Install panels surrounding Utility Circles
first. These panels have a curved notch
in one corner.

T

OPO

panels are designed to slip over

the tee easily yet have sufficient grip to
keep the panel edges in place.

In some cases, Panel Hold-Down Clips
may also be necessary to create a tight
fit between the panels and the grid. By
snapping a Panel Hold-Down Clip over
the bulb of the tee between two panels,
the clip keeps two adjacent panels
pressed tightly to the grid.

Panel Hold-Down Clips should be installed
after two adjacent panels have been laid
in place.

After all T

OPO

panels surrounding

Utility Circles have been installed…

…install the remaining panels as indicated
on the 2-D drawing.

Note: T

OPO

Panels all have the same

shape. During installation, each panel can
simply be rotated until properly oriented
with the vaults and valleys of the T

OPO

Grid.

If your installation includes T

OPO

panels

with preformed Utility Circles, note their
locations on the 2-D drawing and install
these accordingly.

I.