beautypg.com

Trim-Tex Ceiling Mounted Deflection Bead User Manual

Ceiling mounted deflection bead, Ceiling drywall stud

background image

Installation Instructions

Please read entire instruction

before proceeding.

Improper installation will void

any applicable warranty.

Ceiling Mounted

Deflection Bead

Step 1.

Hang your drywall with no more than 7/8" from

the ceiling or as specified by your architect.

Installation

Step 3.

Snip your bead to length and dry fit to the

ceiling for accurate installation.

Step 4.

Apply a narrow layer of

to the ceiling. Be sure to add Trim-Tex Mud-

Max (#850) to the setting and base coat of compound.
Embed the deflection bead into the compound and
press into place with a taping knife. Coat the bead as
needed.

Taping Joint

Compound

Ceiling

Drywall

Drywall

Stud

Trim-Tex Stock #9240
Ceiling Mounted
Deflection Bead

Set Drywall Down

Finished look
after protective
tear off strip is
removed

Steel Ceiling Runners (deflection track)

Fill, Void or Cavity Material

as specified

Step 5.

P

emove the tear away strip for a clean

and crisp finish.

rior to the final sanding

r

DO NOT USE SETTING TYPE JOINT

COMPOUNDS (HOT MUD)

www.trim-tex.com

• 3700 W. Pratt Ave. Lincolnwood, IL 60712-2508 • Phone: (847) 679-3000 • Fax: (847) 679-3017

Step 2.

Fill the void shown in

with fire caulk

or materials specified by the architect.

Figure A

Ceiling

Drywall

Stud

Fill, Void or Cavity
Material as specified

Ceiling

Drywall

Stud

Trim-Tex Stock #9240
Ceiling Mounted
Deflection Bead

Set Drywall Down

Trim-Tex Mud Max

boosts the performance

and strength of any

drywall compound.

Figure A

LENGTH

40

10'

9240

40

12'

9242