Pre Start-Up

24

Pre-Startup Checklist

Complete this checklist after installing the unit to verify all
recommended installation procedures are complete before
unit startup. This does not replace the detailed instructions
in the appropriate sections of this manual. Disconnect
electrical power before performing this checklist. Always
read the entire section carefully to become familiar with the
procedures.

Hazardous Voltage w/Capacitors!

Disconnect all

electric power, including remote disconnects and discharge

all motor start/run capacitors before servicing. Follow proper

lockout/ tagout procedures to ensure the power cannot be

inadvertently energized. For variable frequency drives or

other energy storing components provided by Trane or

others, refer to the appropriate manufacturer’s literature for

allowable waiting periods for discharge of capacitors. Verify

with an appropriate voltmeter that all capacitors have

discharged. Failure to disconnect power and discharge

capacitors before servicing could result in death or serious

injury.

WARNING

Receiving

Inspect unit and components for shipping damage. File

damage claims immediately with the delivering carrier.

Check unit for missing material. Look for ship-with

options and sensors that may be packaged separately
from the main unit.

Check nameplate unit data so that it matches the sales

order requirements.

Unit Location

1. Ensure the unit location is adequate for unit dimensions,
ductwork, piping, and electrical connections.

2. Ensure access and maintenance clearances around the
unit are adequate.

Unit Mounting

1. Ensure unit is installed level.

Component Overview

1. Ensure the fan rotates freely in the correct direction.

2.Ensure all unit access panels are in place.

3.Verify that a clean air filter is in place.

Unit Piping

1. Properly vent the hydronic coil to allow water flow
through the unit.

2. Tighten all pipe connections adequately.

3. Set water flow to the unit properly if unit piping has the
circuit setter valve (installed by others).

4. Check strainers (if installed by others) for debris after
apply system water.

5. Verify the condensate drain piping is complete for the
unit drain pan.

7. Ensure the drain pan and condensate line are not
obstructed. Remove any foreign matter that may have
fallen into the drain pan during installation.

Electrical

Check all electrical connections for tightness.

Electrical Note: Some circumstances may require the unit
to run before building construction is complete. These
operating conditions may be beyond the design
parameters of the unit and may adversely affect the unit.