TU-LSC-IOM

Installation Checklist

17

The following checklist is only an abbreviated guide to the
detailed installation procedures given in this manual. Use this
list to ensure all necessary procedures are complete. For more
detailed information, refer to the appropriate sections in this
manual.

1. Inspect the unit for shipping damage.

2. Level installation location to support the unit weight

adequately. Make all necessary ceiling openings to allow
adequate air flow and service clearances.

3. Ensure the unit chassis is installed level.

4. Verify that wall and ceiling openings are properly cut per

the unit submittals.

5. Verify that installation of units meets the national Fire

Protection Association (N.F.P.A.) Standard 90A or 90B
concerning the use of concealed ceiling spaces as return air
plenums. Verify correct ceiling opening dimensions on unit
submittals. Secure the unit and any accessory items properly
to the ceiling support rods.

6. Complete all piping connections correctly.

7. Check field sweat connections for leaks and tighten the

valve stem packing, and piping package unions if necessary.

8. Install condensate drain line connections if required.

9. Pitch condensate drain line away from LSC unit one-inch

drop per ten feet of pipe.

Hazardous Voltage w/Capacitors!

Disconnect all electric power, including remote
disconnects and discharge all motor start/run
capacitors before servicing. Follow proper lockout/
tagout procedures to ensure the power cannot be
inadvertently energized. For variable frequency drives
or other energy storing components provided by Trane
or others, refer to the appropriate manufacturer’s
literature for allowable waiting periods for discharge of
capacitors. Verify with an appropriate voltmeter that all
capacitors have discharged. Failure to disconnect
power and discharge capacitors before servicing
could result in death or serious injury

WARNING

Unit Leveling!

The unit must be installed level (zero tolerance) in both
horizontal axis for proper operation.

NOTICE

10. Complete all necessary duct connections.

11. Install the filed supplied controls.

12. Complete all interconnection wiring.

13. Connect electrical supply power according to the

NEC and unit wiring diagrams.

14. Remove any miscellaneous debris, such as

sheetrock dust, that may have infiltrated the unit during
construction.

15. Replace the air filter (if installed) as required.