beautypg.com

Putting into operation, 1 connecting the appliance, 2 fill up and connect the water tank – Memmert ICH C (with CO2 control) Climate chambers User Manual

Page 20

background image

20

D30393 | Date 10/2014

Putting into operation

4. Putting into operation

Caution:

The first time the appliance is operated, it must not be left unattended until it has reached

the steady state.

4.1 Connecting the appliance

Caution:

Observe the country-specific regulations when mak-

ing connections (e.g. in Germany DIN VDE 0100 with

residual current circuit breaker). Observe the connec-

tion and power ratings (see nameplate and “Technical

Data” on page 13).

Make sure to establish a safe PE

conductor connection.

Plug the provided power cable into the rear of the appli-

ance and connect it to the power supply ( Fig. 9 ).
Lay the power cable so that

it is always accessible and within reach so it can be disconnected quickly in the event of

failure or emergencies;

no one can trip over it;

it does not come into contact with any hot parts.

4.2 Fill up and connect the water tank

Water specifications

Water specifications

For steam creation, use only demineralised water (aqua dem) in accordance with

VDE 0510/DIN EN 50272; regulations must be strictly adhered to (production conductivity

≥ 5 ≤ 10 µS/cm). Battery water in accordance with VDE 0510 is available in larger chemist’s

shops, super markets, hardware stores and in the wholesale trade. The standard VDE 0510/

DIN EN 50272 has to be explicitly specified on the label.
Otherwise, possible calcification in the steam generators, steam piping and peristaltic pumps

could affect the operability of the device.
The water used must have a pH value between 5 and 7 and be chlorine-free.

Fig. 9

Connect the power

cable to the rear of the appliance

Fig. 9

Fig. 9

Connect the power

Connect the power