7

Commissioning

Commissioning for 9300 series standard devices

EDKMF2102 DE/EN/FR 7.1

78

l

Inbetriebnahme93XX

Detailed
information

Procedure

Step

4.

Make other necessary controller settings.
W Commissioning of the controller

Documentation
for the respective
controller

l

For initial commissioning set code C0005 = 1011 (signal
configuration: speed control via AIF).

l

Enable the controller.
– Terminal 28 (RFR: controller enable) is always active and has

to be HIGH during operation. Otherwise the controller will be
inhibited.

l

Select the speed setpoint with C0141 in % of n

max

(value in

C0011).

Note

With the signal configuration C0005 = xx11, terminal A1 is switched
as a voltage output. This means that only the following terminals
should be connected:

l

X5.A1 to X5.28 (Controller enable)

l

X5.A1 to X5.E1 (Clockwise rotation / QSP)