Commissioning

Before switching on

EDKMF2102 DE/EN/FR 7.1

74

l

H1inbet−bevor

7

Commissioning

Before switching on

(

Stop!

Before switching on the standard device with the communication module for
the first time, ...

ƒ

check the entire wiring with regard to completeness, short circuit, and
earth fault;

ƒ

when using the communication module EMF2102IBC−V003 (LECOM−LI),
check the position of the selector for the required output power (

^ 72).