beautypg.com

1 mechanical installation, Mechanical installation, Mounting for 0.25 kw and 0.37 kw standard devices – Lenze E84AYCPM User Manual

Page 22: 5installation

background image

Lenze · E84AYCPM communication module (PROFIBUS®) · Communication Manual · DMS 5.0 EN · 11/2012 · TD17

22

5

Installation

5.1

Mechanical installation

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5.1

Mechanical installation

The communication module can be plugged into the MCI slot or unplugged while the inverter is

switched on. When the module is plugged in, it is detected automatically, and a plausibility check

regarding the function and version is carried out.

5.1.1

Mounting for 0.25 kW and 0.37 kW standard devices

[5-1]

Mounting for 0.25 kW and 0.37 kW standard devices

Mounting steps

1. Pry the cover out of the MCI slot using a screwdriver and remove it (1, 2).
2. Loosen the securing screw for the communication module on the standard device (3).
3. Insert the communication module into the MCI slot of the standard device (4).
4. Fasten the securing screw (5).

E84YCPM002D