Kinze Grain Carts Rev. 7/14 User Manual
Page 3

®
Grain Cart
M0238-01
5/12
1
Predelivery/Delivery Checklist
900-1100-1300-1500 Grain Cart
PREDELIVERY/DELIVERY CHECKLIST
TO THE DEALER
Predelivery service includes assembly, lubrication, adjustment and test. This service ensures cart is delivered to retail
customer/end user ready for field use.
PREDELIVERY CHECKLIST
Use this checklist to inspect cart after it is completely assembled. Check off each item as it is found satisfactory or after
proper adjustment is made.
Wheel nuts torqued to 350 ft-lb (474 N-m).
Tires inflated to specified air pressure. (If Applicable)
All grease fittings lubricated and gearbox oil level checked.
All safety decals and SMV sign are correctly located and legible. Replace if damaged.
SMV decal is in place and shipping cover removed.
Safety/warning lights working properly.
Test run augers. Do not operate tractor PTO above 750 PTO RPM with augers empty.
Check driveline. See “Driveline Inspection” in Operation section.
V-belts aligned and properly tensioned.
Check track alignment. See “Track Alignment” in Maintenance section. (If Applicable)
Safety screens over horizontal auger are in place and properly secured.
Auxiliary safety chains are properly installed and hardware torqued to specification.
Paint all parts scratched in shipment.
This wagon has been thoroughly checked and to the best of my knowledge is ready for delivery to the customer.
(Signature Of Set-Up Person/Dealer Name/Date)
OWNER REGISTER
Name
Delivery Date
Street Address
Model No.
Serial No.
City, State/Province
Dealer Name
ZIP/Postal Code
Dealer No.