Kinze 3140 Stack Fold Planter Rev. 7/14 User Manual
Page 5

TM
Model 3140
M0245-01
9/12 1
Predelivery/Delivery Checklist
TO THE DEALER
Predelivery service includes assembly, lubrication, adjustment, and test. This service makes sure planter is delivered to
the retail customer/end user ready for field use.
PREDELIVERY CHECKLIST
Use the following checklist and inspect planter after it is completely assembled. Check off each item found satisfactory
or after proper adjustment is made.
Row units properly spaced and optional attachments correctly assembled.
EdgeVac
components properly installed (as applicable).
All grease fittings in place and lubricated.
All working parts move freely, bolts are tight, and cotter pins are spread.
Check all drive chains for proper tension and alignment.
Check for oil leaks and proper hydraulic operation.
Hydraulic hoses correctly routed to prevent damage.
Inflate tires to specified air pressure and torque wheel lug bolts and lug nuts as specified in the manual.
All safety decals correctly located and legible. Replace if damaged.
All reflective decals and SMV sign correctly located and visible when the planter is in transport position.
Safety/warning lights correctly installed and working properly.
Paint all parts scratched in shipment or assembly.
All safety lockup devices on the planter and correctly located.
Auxiliary safety chain properly installed and hardware torqued to specification.
This planter has been thoroughly checked and to the best of my knowledge is ready for delivery to the retail
customer/end user.
(Signature Of Set-Up Person/Dealer Name/Date)
RETAIL CUSTOMER/END USER
Name
Delivery Date
Street Address
Model No. 3140
Serial No.
City, State/Province
Dealer Name
ZIP/Postal Code
Dealer No.