beautypg.com

Bryant Series E/F 310AAV User Manual

Page 22

background image

22

Table 7—Electrical Data

FURNACE SIZE

VOLTS---

HERTZ---

PHASE

OPERATING VOLTAGE

RANGE

MAXIMUM

UNIT AMPS

UNIT

AMPACITY#

MAXIMUM

WIRE

LENGTH FT.

(M)‡

MAXIMUM

FUSE OR

CKT BKR

AMPS†

MINIMUM

WIRE

GAUGE

Maximum*

Minimum*

045---08/024045

115---60---1

127

104

5.2

7.26

49 (14.9)

15

14

045---12/036045

115---60---1

127

104

7.2

9.79

37 (11.2)

15

14

070---08/024070

115---60---1

127

104

5.1

7.14

51 (15.5)

15

14

070---12/036070

115---60---1

127

104

7.2

9.72

38 (11.5)

15

14

070---16/048070

115---60---1

127

104

9.5

12.60

29 (8.8)

15

14

090---14/042090

115---60---1

127

104

8.6

11.39

32 (9.7)

15

14

090---16/048090

115---60---1

127

104

10.0

13.09

28 (8.5)

15

14

090---20/060090

115---60---1

127

104

14.1

18.2

31 (9.4)

20

12

110---12/036110

115---60---1

127

104

8.6

11.27

32 (9.7)

15

14

110---16/048110

115---60---1

127

104

10.2

13.34

27 (8.2)

15

14

110---22/066110

115---60---1

127

104

15.1

19.42

29 (8.8)

20

12

135---16/048135

115---60---1

127

104

10.5

13.63

27 (8.2)

15

14

135---22/066135

115---60---1

127

104

14.5

18.72

30 (9.1)

20

12

155---20/060155

115---60---1

127

104

15.4

19.83

29 (8.8)

20

12

* Permissible limits of the voltage range at which the unit operates satisfactorily.

# Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier,

etc.) full load amps.

{

Time---delay type is recommended.

}

Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.

12. Complete electrical box wiring and installation. Connect

line voltage leads as shown in Fig. 26. Use best practices

(NEC) for wire bushings, strain relief, etc.

13. Reinstall cover to J--Box. Do not pinch wires between

cover and bracket.

POWER CORD INSTALLATION IN FURNACE J--BOX
NOTE
: Power cords must be able to handle the electrical
requirements listed in Table 7. Refer to power cord
manufacturer’s listings.

1. Remove cover from J--Box.
2. Route listed power cord through 7/8--in. (22 mm) diameter

hole in J--Box.

3. Secure power cord to J--Box bracket with a strain relief

bushing or a connector approved for the type of cord used.

4. Secure field ground wire to green ground screw on J--Box

bracket.

5. Connect line voltage leads as shown in Fig. 26.
6. Reinstall cover to J--Box. Do not pinch wires between

cover and bracket.

BX CABLE INSTALLATION IN FURNACE J--BOX

1. Remove cover from J--Box.
2. Route BX cable into 7/8--inch (22 mm) diameter hole in

J--Box.

3. Secure BX cable to J--Box bracket with connectors ap-

proved for the type of cable used.

4. Secure field ground wire to green ground screw on J--Box

bracket.

5. Connect line voltage leads as shown in Fig. 26.
6. Reinstall cover to J--Box. Do not pinch wires between

cover and bracket.

310AA

V