Setting up the basic unit, Start-up, Installing the heating bath – Heidolph Hei-VAP Advantage User Manual
Page 23: 3 setting up the basic unit, 4 start-up

Set-up and Start-up
Hei-VAP Value, Hei-VAP Advantage
15
EN
4. Switch off the unit.
5. Remove the plug.
6. Package the unit.
CAUTION
Vibrations and shocks!
Damaging the housing and the mechanical system of the equip-
ment.
Avoid vibrations and shocks.
Carry the basic unit from below.
4.3 Setting up the basic unit
Chemicals may reach the atmosphere (via the pump) when handling hazardous materi-
als and distilling solvents.
Verify that harmful fumes or gases do not affect the operating personnel. The pump
exhaust air must be channeled to an exhaust hood or condensate condenser.
Verify that the interior and exterior pressure variance equals no more than 2 bar.
Verify that the emergency stop for the power supply is always easy to reach.
Avoid setting up the rotary evaporator in corrosive atmospheres.
This reduces the service life of the equipment.
CAUTION
Tilting the heating bath!
Damaging the housing and risk of injuries.
Place the basic unit on a solid level surface with sufficient
room.
Select a level, solid, and heat resistant surface.
4.4 Start-up
4.4.1
Installing the heating bath
The basic unit is located on a suitable place.
Figure 4
–2: Heating bath
1
Heating bath
2
Base plate
Where?
Start-up
Installing the heat-
ing bath
2
1