beautypg.com

Pg 2, Detail view a (1 : 2), Detail view b (1 : 2) – Gamber-Johnson 7160-0496 User Manual

Page 2: Kit installation

background image

After rotating Power Plug into

pocket push cable past snap

finger. Pull cable tightly against

inside wall of housing, making

radius as small as possible.

Tighten cable clamp screw.

Fig. 1

Cable Clamp

#6 X 3/8"

Screw

Cable Clamp

#6 X 3/8"

Screw

Terminal Cover

#8 X 5/8"

Screw

KIT INSTALLATION

Place Docking Station on a soft flat surface . Orient with the bottom facing up and lock

1.

towards installer.

If attached remove mounting system and/or cable restraint bracket from bottom of dock.

2.

With cable of Power Plug oriented perpendicular to the bottom of the dock insert Power Plug

3.

into socket labeled

DC IN 15.6V. After Power Plug is inserted into socket rotate Power Plug

towards LAN/WAN labels to lock Power Plug into socket.

Attach Power Plug Cable to Power Supply.

4.

Place power Supply in pocket on right hand side of docking station. Ribbed surface of Power

5.

Supply should be facing up.

Insert cable between snap finger and frame and secure with Cable Clamp and #6 X 3/8"

6.

screw. See Fig. 1 for correct position of cable to maximize space around RF connector, if

dock is so equipped.

Route cable across dock and place connectors in space provided in front of Power Supply

7.

and beneath Terminal Cover.

With connectors and wires placed into space provided attach Terminal Cover to dock using 2

8.

#8 X 5/8" screws. Terminal Cover should overlap edge of Power Supply and secure it in

pocket when the screws are tightened (Fig. 2).

Install second Cable Clamp and #6 X 3/8" screw.

9.

Fig. 2

Pg. 2