ERICO TDX Series Flush User Manual
Flush mounting instructions
Flush Cover Plate
2002 ERICO
Inc, 34600 Solon Rd, Solon, OH 44139
Page 1 of 1
Doc: HBCR1611, Rev: 1, Date: JULY 17, 2002
TDX
Flush Mounting Instructions
PREPARATION
DANGER
: Electrical shock or burn hazard. Installation
of TVSS should be made by qualified personnel. Failure to
lockout electrical power during installation or maintenance
can result in fatal electrocution or severe burns.
These installation instructions apply specifically for the Flush Mount
installation of the TDX range of Surge Protectors. These instructions
are to be used in conjunction with the installation instructions for the
TDX product.
To simplify installation it is recommended to use a short (<6”) flexible
conduit to connect the TVSS nipple to the electrical panel. The TVSS
is then mechanically fixed by connecting the TVSS to the Flush Cover
Plate, which in turn is fixed to the drywall.
Alternatively the TVSS can be mechanically fixed via its flanges
and/or nipple. However, care is required to ensure the TVSS is
positioned so the front is flush with the outer drywall.
This kit includes:
a) 1 x Flush Cover plate (FCP)
b) 2 x Mounting Brackets
c) 4 x FCP Mounting Screws
d) Instructions
Quick Installation
1. Disconnect and lockout electrical power to the electrical panel
(load center / panelboard / circuit breaker box) where the
TDX/FCP is to be installed. Follow all applicable electrical codes
and procedures.
2. Loosen front screws in TDX end plates as shown in Figure 1.
Apply FCP Mounting Brackets and retighten TDX screws.
3. Attach flexible conduit (not included in FCP kit) to the TDX unit.
4. Mark and cut out section of drywall allowing approximately 1/2"
clearance around TDX enclosure and attached Flush Cover Plate
Mounting Brackets.
5. Align FCP with drywall opening, mark locations of drywall
anchors (not included) and install anchors per manufacturer’s
instructions.
6. Insert TDX into drywall cutout and connect flexible conduit to
electrical panel (Figure 2).
7. Attach the Flush Cover Plate to the TDX unit using the 4
Mounting Screws provided (Figure 3).
8. Secure the Flush Cover Plate to the drywall using the drywall
anchors.
9.
Complete electrical TVSS connection as per TVSS instructions.
Loosen front screws
on TDX and attach
FCP mounting
brackets
FIGURE 1
FIGURE 3
Electrical
Panel
Drywall
FIGURE 2