Installation instructions – CHAMPION EUCCW Series User Manual
Page 52
44
Installation Instructions _______
Initial Start-up
Initial Start-up
Check the direction of rotation of the conveyor belt by observing the direction arrow
decal on the large conveyor drive sprocket. The sprocket is located on the side of
the unload section.
If rotation direction is incorrect, reverse wires L1 and L2 on the disconnect switch
side of the main electrical connection terminal block located inside the control
cabinet.
Adjust the conveyor belt drive clutch. The clutch is located on the large conveyor
drive sprocket on the side of the unload section.
To adjust:
Tighten the clutch nut on the center of the drive sprocket until the conveyor begins
to move.
Have a person of average build (about 185 lbs.) hold the belt with
both hands and pull against the direction of travel.
Continue tightening the clutch nut until maximum effort against the
direction of travel is required to stop the belt.
CHECK AND ADJUST CLUTCH MONTHLY.
Check the alignment of the conveyor belt. Adjust the take-up assemblies so that
Conveyor Rollers (A) track evenly on Conveyor Sprockets (B).
Check the Energy Sentinel (idle pump shut-off) by placing a tray or dish on the
moving conveyor belt.
The pumps will start as the object enters the tunnel of the machine.
The optional econo-rinse pump starts with the final rinse.
Check pump motor rotation, CW when viewed from the rear of motor.
Check the final rinse temperature as the object enters the final rinse area.
The Final rinse temperature must be 180-195°F.
Adjust the temperature of the incoming water supply if necessary.
Adjust the booster thermostat setting if necessary.
Check the Final rinse water pressure as the object enters the final rinse area.
The final rinse pressure must be 20-22 PSI.
Adjust the Pressure Reducing Valve setting if necessary.