JLG 600SC_660SJC ANSI Service Manual User Manual
Page 30
SECTION 2 - GENERAL
2-8
– JLG Lift –
3120794
Function Test of All Systems
21
21
21, 22
Paint and Appearance
7
7
Stamp Inspection Date on Frame
22
Notify JLG of Machine Ownership
22
Footnotes:
1
Prior to use each day; or at each Operator change
2
Prior to each sale, lease, or delivery
3
In service for 3 months or 150 Hours; or Out of service for 3 months or more; or Purchased used
4
Annually, no later than 13 months from the date of the prior inspection
Performance Codes:
1 - Check for proper and secure installation
2 - Visual inspection for damage, cracks, distortion or excessive wear
3 - Check for proper adjustment
4 - Check for cracked or broken welds
5 - Operates Properly
6 - Returns to neutral or "off" position when released
7 - Clean and free of debris
8 - Interlocks function properly
9 - Check for signs of leakage
10 - Decals installed and legible
11 - Check for proper fluid level
12 - Check for chafing and proper routing
13 - Check for proper tolerances
14 - Properly lubricated
15 - Torqued to proper specification
16 - No gouges, excessive wear, or cords showing
17 - Properly inflated and seated around rim
18 - Proper and authorized components
19 - Fully charged
20 - No loose connections, corrosion, or abrasions
21 - Verify
22 - Perform
23 - Sealed Properly
24 - Drain, Clean, Refill
Table 2-3. Inspection and Preventive Maintenance Schedule
AREA
INTERVAL
Pre-Start
1
Inspection
Weekly
Preventive
Maintenance
Monthly
Preventive
Maintenance
Pre-Delivery
2
or Frequent
3
Inspection
Annual
4
(Yearly)
Inspection
Every 2
Years