Recoil spring assembly, Recoil spring assembly -25, Recoil spring required tools - assembly -25 – JLG 600SC_660SJC ANSI Service Manual User Manual
Page 129
SECTION 6 - UNDERCARRIAGE
3120794
– JLG Lift –
6-25
Recoil Spring Assembly
1.
Check the condition of the threads on retaining rod
(12), nut (7), and nut (8). If any of the threads are
worn or damaged, use new parts for replacement.
PERSONAL INJURY OR DEATH CAN RESULT FROM RECOIL
SPRING FORCE.
RECOIL SPRING FORCE, IF NOT RELIEVED, CAN RESULT IN
PERSONAL INJURY OR DEATH.
RELIEVE SPRING FORCE BEFORE REMOVING THREADED
RETAINER, PERFORMING REPAIRS ON RECOIL SPRING HOUS-
ING, OR REMOVING RECOIL SPRING.
MAXIMUM RECOIL SPRING PRESSURE IS 3000 PSI (20,700 KPA).
2.
Loosely assemble the recoil spring assembly. Install
retaining rod (12) in plate (11), in spring (10) and in
support (9).
3.
Install tooling (C) on tooling (B), as shown.
NOTE: Two adjustable supports (1), reaction plate (2) and
movable plate (3) are part of tooling (A).
4.
Position two supports (1) of tooling (A) in order to
support the recoil spring assembly. Make sure the
two supports are level.
5.
Adjust the spacing between reaction plate (2) and
movable plate (3) so the spacing is approximately
the same length as the recoil spring assembly.
Table 6-10. Recoil Spring Required Tools - Assembly
Tool
Part #
Description
Qty.
A
4C-9540
Bench
1
B
8S-7172
Hydraulic Cylinder
1
3S-6224
Electric Hydraulic Pump
1
8T-0820
Pressure Gauge
1
3B-7722
Bushing
2
1P-2376
Coupler Assembly
2
1P-2377
Plug
2
8F-0024
Hose Assembly
2
C
8S-9971
Ram Adapter
1
D
9U-6545
46mm Socket
1