Inspection and preventive maintenance schedule -6 – JLG 600SC_660SJC ANSI Service Manual User Manual
Page 28
![background image](/manuals/552315/28/background.png)
SECTION 2 - GENERAL
2-6
– JLG Lift –
3120794
Table 2-3. Inspection and Preventive Maintenance Schedule
AREA
INTERVAL
Pre-Start
1
Inspection
Weekly
Preventive
Maintenance
Monthly
Preventive
Maintenance
Pre-Delivery
2
or Frequent
3
Inspection
Annual
4
(Yearly)
Inspection
Every 2
Years
Boom Assembly
9
Boom Weldments
1,2,4
1,2,4
Hose/Cable Carrier Installations
1,2,9,12
1,2,9,12
Pivot Pins and Pin Retainers
1,2
1,2
Sheaves, Sheave Pins
1,2
1,2
Bearings
1,2
1,2
Wear Pads
1,2
1,2
Covers or Shields
1,2
1,2
Extend/Retract Chain or Cable Systems
1,2,3
1,2,3
Platform Assembly
9
Platform
1,2
1,2
Railing
1,2
1
1,2
Gate
5
1
1,5
Floor
1,2
1
1,2
Rotator
9,5
Lanyard Anchorage Point
2
1,2,10
1,2,10
Turntable Assembly
9
Swing Bearing or Worm Gear
1,2,14
1,2,3,13,14
Oil Coupling
9
Swing Drive System
1,2,14
1,2,3,13,14
Turntable Lock
1,2,5
1,2,5
Hood, Hood Props, Hood Latches
5
1,2,5
Chassis Assembly
9
Drive Motors
1,2
1,2
Torque Hubs
11
11
Functions/Controls
9
Platform Controls
5
5
6
6
Ground Controls
5
5
6
6
Function Control Locks, Guards, or Detents
1,5
1,5
5
5
Footswitch
1,5
5
5
Emergency Stop Switches (Ground & Platform)
5
5
5
Function Limit or Cutout Switch Systems
5
5
Capacity Indicator
5
Drive Brakes
5