Burnham 81433101R16-1/10 User Manual
Page 22
C
. Two-Pipe Oil Lines.
1. For two-pipe systems where more lift is required,
the two-stage fuel unit is recommended. Table
2 (single-stage) and Table 3 (two-stage) show
allowable lift and lengths of 3/8-inch and ½-inch
OD tubing for both suction and return lines. Refer
to Figure 17.
Figure 1: Two-Pipe Installation
Lift "H"
Maximum Length of Tubing
"H" + "R"
3/8" OD
Tubing (3 GPH)
1/" OD
Tubing (3 GPH)
0'
93'
100'
2'
85'
100'
4'
77'
100'
6'
69'
100'
8'
60'
100'
10'
52'
100'
12'
44'
100'
14'
36'
100'
16'
27'
100'
18'
---
76'
Table 3: Two-Stage Units (340 RPM) -
Two Pipe Systems
See also other documents in the category Burnham Water boiler:
- Gas-Fired (4 pages)
- Independence IN8 (1 page)
- Independence IN9 (92 pages)
- ALP105 (100 pages)
- 53A (22 pages)
- CHG150 (72 pages)
- Series 2B (52 pages)
- LEDV-3 (1 page)
- ALP399 (3 pages)
- MST513 (4 pages)
- HF SERIES (28 pages)
- SL AL119SL (1 page)
- PVG (64 pages)
- Independence PV (6 pages)
- V9A (64 pages)
- SERIES 3 1099-01R1-/10 (8 pages)
- RSA (52 pages)
- E4 (8 pages)
- SCG 1100-H4 (96 pages)
- SERIES 2 (6 pages)
- MEGASTEAM MST396 (68 pages)
- V7 SERIES (47 pages)
- V9 (4 pages)
- LE L7248 (28 pages)
- LEDV SERIES (36 pages)
- MST396 (64 pages)
- ES2 (52 pages)
- ALP080 (7 pages)
- Minuteman II (6 pages)
- PVG & SCG (4 pages)
- V8 Series (100 pages)
- FCM120 (80 pages)
- Carefree DOE (3 pages)
- 20_PV_I (32 pages)
- BOILERS (48 pages)
- MPO Series (4 pages)
- V8H Series (2 pages)
- 8H (92 pages)
- SM-6 (28 pages)
- SCG (92 pages)
- CHG (4 pages)
- ALPINE (8 pages)
- MULTI-PASS (108 pages)
- C4 SERIES (2 pages)