Figure 4-8: pump-to-balancer valve dome connection – Hale CAFS Attack User Manual
Page 34

❑ Installer Installation
34
CAFS Air Bottle Installer/Operation Guide
p/n: 029-0020-85-0
Figure 4-7: 4,500 PSI HIGH Pressure Balancing Regulator and Dome Connections
9. Plumb a 3/8”
(9.5 mm) tubing
line between the
bottom or dome
port on the balanc-
ing regulator valve
to the pump dis-
charge for water-
to-air operating
pressure balance.
(See Figure 4-8:
“Pump-to-Bal-
ancer Valve Dome
Connection.”)
Figure 4-8: Pump-to-Balancer Valve Dome Connection