beautypg.com

3 receiving and inspection, 1 receiving, Items furnished – Hale CAFS Attack User Manual

Page 23: Items required, by builder/installer, Receiving and inspection, Receiving, 3receiving and inspection

background image

23

CAFS Air Bottle Installer/Operation Guide
p/n: 029-0020-85-0

Rec eiv in g a n d In sp e ctio n

3

Receiving and inspection

3.1

RECEIVING

Before shipping from Class1 the CAFSAttack Compressed Air Foam Pump-
ing System is factory inspected and tested. However, we recommend that
you:

1. Inspect the packaging for any signs of physical damage during shipment. Note

any apparent damage on the bill of lading and request the delivery agent to
sign it. Report the damage to Class1, Ocala, FL. and the shipping company.

2. Verify that the system configuration and options match your purchase order.

Report any discrepancies to Class1.

Class1

A Unit of IDEX Corporation

607 NW 27th Avenue

Ocala, FL 34475 U.S.A.

Telephone . 352-629-5020

Fax ............ 352-629-3569

Web:..........

www.class1.com

Items Furnished

The CAFSAttack system is shipped with all OEM required connections
tagged for easy identification. For a listing of items furnished, see Section
2.1 “Overview,” beginning on page 15.

Also included are the necessary labeling, plates and instruction plates
which must be installed in their appropriate locations to ensure proper per-
sonal and system operating safety.

Items Required, by Builder/Installer

The following items are a sampling of what might be required to complete
the installation, connecting the system to your apparatus. The items
required vary depending on your system configuration. Also see the Foam-
Logix Model 2.1A, 3.3 or 5.0 Manual for additional information.