Installation tasks, Table 1 installation tasks, Installation precautions – Brocade Communications Systems Brocade ICX 6650 53-1002599-01 User Manual
Page 26: General precautions, All fiber-optic interfaces use class 1 lasers, Table 1

10
Brocade ICX 6650 Hardware Installation Guide
53-1002599-01
Installation tasks
2
Installation tasks
Follow the steps listed in
to install your device. Details for each of these steps are provided
on the pages indicated.
Installation precautions
Follow all precautions when installing a device.
General precautions
CAUTION
All fiber-optic interfaces use Class 1 lasers.
TABLE 1
Installation tasks
Task
Number
Task
Where to Find More Information
1
Ensure that the physical environment that will host the
device has the proper cabling and ventilation.
“Environmental considerations”
2
Install the device in an equipment rack.
“Installing the device in a rack or cabinet”
3
Attach a terminal or PC to the device. This will enable you
to configure the device through the Command Line
Interface (CLI).
4
Plug the device into a nearby power source that adheres to
the regulatory requirements outlined in this manual.
5
No default password is assigned to the CLI. For additional
access security, assign a password.
6
Before attaching equipment to the device, you need to
configure an interface IP address to the subnet on which
the device will be located. Initial IP address configuration
is performed using the CLI with a direct serial connection.
Subsequent IP address configuration can be performed
using the Web management interface.
8
Once you power on the device and assign IP addresses,
the system is ready to accept network equipment.
“Devices running Layer 3 software”
9
Test IP connectivity to other devices by pinging them and
tracing routes.
10
Continue configuring the device using the CLI or the Web
management interface.
Brocade ICX 6650 Administration Guide
11
Secure access to the device.
Brocade ICX 6650 Administration Guide