Inspection/ shipping – Agilent Technologies 75000 Series C User Manual
Page 14

Inspection/
Shipping
This section describes initial (incoming) inspection and shipping guidelines
for the AFG.
Initial
Inspection
Use the steps in Figure 1-2 as guidelines to perform initial inspection of
the AFG.
WARNING
To avoid possible hazardous electrical shock, do not perform
electrical tests if there are signs of shipping damage to the
shipping container or to the instrument.
Figure 1-2. Initial (Incoming) Inspection Guidelines
12 General Information
Agilent E1445A Service Manual
This manual is related to the following products: