UNCRATE & SETUP

1. Remove shrink wrap and upper crating structure. Remove the two black shelves and work table from

the skid. Locate the box that contains the casters.


2. Attach the casters to the mounting plates using the supplied hardware. The swivel casters should be

mounted on the same end of the machine as the hydraulic cylinder and digital readout.









3. Once the casters are installed, use a sling positioned as shown above, to lift the machine onto the

casters. CAUTION: MACHINE IS HEAVY AND MAY CAUSE DAMAGE OR INJURY IF CARE IS
NOT USED.


4. Install the bottom shelf (with angled side) onto the bottom of the frame. It will rest on the caster

mounting plates. The bent sides point up. Install the upper shelf (rectangle shaped) next. This one
also should have the bent sides pointing up. You will have to tilt the shelves to fit in between the legs
and then lay them flat.













5. Slip the swivel work table into the open end of the square tube leg



.

#2 Swivel
Casters This
End

#2 Swivel
Casters This
End

#3 Sling Position

#3 Sling Position

#4 Upper Shelf

#4 Lower Shelf

#5 Swivel Work table

#5 Swivel Work
table goes in here